|
These standards and specifications are for use
with the design and construction of gravity sanitary sewer lines
within new
developments. Some projects may require specific specification
be created by the developer's engineer depending on size, location,
depth or other factors which the District's standard specifications
do not cover. The developer's engineer must consult with the
District on each project to determine if project-specific
specifications are required.
Standards
& Specifications (PDF - 19.4 MB)
Service Line
Installation (including disconnect valves) (PDF - 24 KB)
Construction Notes (PDF - 48 KB)
Design Criteria for Gravity Sewer Lines (PDF - 20 KB)
Sewer Detail
(If you are unable to access the drawing files, email
Engineering to
have them sent)
Manhole Detail
(Autocad DWG -
187K)
Manhole Detail-Outside
Drop (Autocad DWG - 103K)
Trench (Autocad DWG - 38K)
Service (Autocad DWG - 54K)
Disconnect Valve
Schematic (Autocad DWG - 28K)
Clean-out (Autocad DWG - 40K)
Concrete Encasement (Autocad
DWG - 79K)
Utility Plan
Boxelder Utility Plan - Report Only (PDF-3972 K)
Appendices Table of Contents (PDF-38K)
Appendix A - Boxelder Wastewater Treatment Master Plan
(PDF-11,505K)
Appendix B - Boxelder Collection System Master Plan
(PDF-2,0682K)
Appendix C - Pretreatment Program - Annual Report (PDF-43K)
Appendix D - Site Ownership - Legal Descriptions of Site
(PDF-1,277K)
Appendix E - Agency Contacts (PDF-44K)
Appendix F - Special Surveys, NEPA Review Process and EA Che
(PDF-153K)
Appendix G - Site Characterization - Flood Plain (PDF-654K)
Appendix H - Site Soil Conditions (PDF-1643K)
Appendix I - Preliminary Effluent Limits - (WQA-2008)
(PDF-1,300K)
Appendix J - Existing Permit (PDF-1,373K)
Appendix K - Planning and Zoning Information (PDF-592)
Appendix L - Intergovernmental Agreements (IGA's) ( PDF-1,114K)
Appendix M - Financial Information and Rate Study (PDF-653K)
Appendix N - Storm Water Management Plan (PDF-81K)
Appendix O - Summary of Public Meetings and Hearings (PDF-38K)
|